Copy
October 8, 2021
I-110 to Juárez set for overnight closures
Monday, October 11, and Tuesday, October 12,
Nightly from 9pm to 5am
  • Southbound I-110 will be closed to all traffic leading to the Bridge of the Americas.
  • DETOUR: Traffic bound from El Paso to Juárez should use a different Port of Entry.
Crews will be striping and relocating concrete safety barriers.
Monday, October 11, and Tuesday, October 12,
Nightly from 9pm to 5am
  • Gateway Boulevard South will be close to all traffic between Cassidy Road and Thompkins Road
  • Adjacent streets will be closed at Gateway Boulevard South.
  • DETOUR: Take the Cassidy Road/Fort Bliss exit, turn right on Van Buren Avenue, turn left on Loop 478 (Dyer Street), turn left on Thompkins Road, turn right on Gateway South.
Crews will be relocating concrete safety barriers.
 Ongoing closures which will continue without interruption
  • Ramp F which connects westbound I-10 to southbound US 54 and Juárez remains closed until further notice.
  • US 62 (Paisano Drive) remains closed to traffic in both directions between San Marcial Street and Gateway Boulevard South.
  • Gateway Boulevard East remains closed to thru traffic between Loop 478 (Copia Street) and Marr Street.
  • The ramp from southbound US 54 to US 62 (Paisano Drive) remains closed until further notice.
  • Both turnarounds under US 54 at US 62 (Paisano Drive) remains closed until further notice.
  • Intermittent closures on Durazno Avenue, Rosa Avenue and Uva Street.
  • Intermittent lane closures on Gateway Boulevard East between Piedras Street and US 62/180 (Paisano Drive).
  • Intermittent lane closures on Gateway Boulevard West between Boone Street and Palm Street.
THESE CLOSURES ARE SUBJECT TO CHANGE DUE TO WEATHER.

About the I-10 Connect Project

The I-10 Connect project is at the intersection of Interstate 10 and US 54 in El Paso County. The project extends from I-10 to Loop 375 (Cesar Chávez Border Highway) and provides access to the Bridge of the Americas (BOTA) via I-110. The $96 million project includes the construction of four new direct connectors, a full reconstruction of the I-110/US 62 (Paisano Drive) interchange, and removes exit ramps from US 62 to I-110.

I-10 Connect will improve connectivity between I-10 and Loop 375, also providing an alternate route to I-10. It started February 19, 2019, and is expected to be complete in less than three years.

Copyright © *2021 *I-10 Connect El Paso*, All rights reserved.

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
I-10 Connect · 13301 Gateway Blvd W · El Paso, TX 79928-5410 · USA

Email Marketing Powered by Mailchimp