About the I-10 Connect Project
The I-10 Connect project is at the intersection of Interstate 10 and US 54 in El Paso County. The project extends from I-10 to Loop 375 (Cesar Chávez Border Highway) and provides access to the Bridge of the Americas (BOTA) via I-110. The $96 million project includes the construction of four new direct connectors, a full reconstruction of the I-110/US 62 (Paisano Drive) interchange, and removes exit ramps from US 62 to I-110.
I-10 Connect will improve connectivity between I-10 and Loop 375, also providing an alternate route to I-10. It started February 19, 2019, and is expected to be complete in less than three years.
For more information, visit I10ConnectElPaso.com; you can also follow @I10ConnectEP on Facebook and Twitter.
|
|
Cierre de plazo largo, cierran autopista de 27 horas para continuar la obra en nuevo puente interconector
Reunión comunitaria mensual programada este martes por la tarde
en Texas Tech Health Science Center
EL PASO, Texas — Al terminar el Proyecto I-10 Connect, el tráfico de US 54 Sur tendrá acceso a un nuevo puente interconector que pasa sobre del I-10 y llega directamente al Puente Internacional de las Américas y a Ciudad Juárez.
La construcción de este interconector requiere que la obra se realice sobre un puente y el camellón existente del I-10 en el Spaghetti Bowl. Para llevar a cabo este trabajo con seguridad, se requiere de los siguientes cierres en las semanas que vienen.
|
|

Cierre de Largo Plazo: Rampa de Acceso
Lunes, 3 de junio, hasta nuevo aviso:
- La Rampa E que conecta Gateway Boulevard Sur a US 54 Sur al sur de Yandell Drive estará cerrada para todo tráfico.
- DESVIACIÓN: Tomar US 54 Sur de Gateway Boulevard Sur inmediatamente al sur de Pershing Drive.
Cuadrillas estarán trabajando en columnas y en el cabezal.
|
|

Cierran I-10 Oeste por 27-Horas
3am el domingo, 9 de junio, continuando hasta 6am el lunes, 10 de junio
- I-10 Oeste estará cerrado para todo tráfico sobre US 54.
- La Rampa L que conecta Gateway Boulevard Oeste a I-10 Oeste al poniente de la Calle Raynolds estará cerrada para todo tráfico.
- La Rampa C que conecta US 54 Norte a I-10 Oeste estará cerrada para todo tráfico.
- DESVIACIÓN: El tráfico de I-10 Oeste toma la Salida 22B (US 54/Alamogordo/Juárez/Fort Bliss), continua en US 54 Norte, toma la Salida 23 (Fort Bliss/Cassidy Road), luego toma la Salida 22 (Pershing Drive) a Gateway Boulevard Norte. El tráfico usa el retorno renovado en Pershing Drive para tomar Gateway Boulevard Sur luego subir al US 54 Sur y continuar derecho para volver a integrarse al I-10 Oeste.
Cuadrillas estarán perforando para un pilote colado en la lareda del I-10.
|
|

Cierre Nocturno de I-10 Este
Domingo, 9 de junio, 9pm a 5am
- I-10 Este estará cerrado para todo tráfico sobre US 54.
- La rampa de acceso que conecta w Gateway Boulevard Este a I-10 Este al oriente del Circuito 478 (Copia Street) estará cerrada para todo tráfico.
- DESVIACIÓN: El tráfico de I-10 Este toma la Salida 22A (Circuito 478/Copia Street), continua en Gateway Boulevard Este, y se vuelve a integrar al I-10 al oriente de la Calle Raynolds.
- AVISO: El tráfico de US 54 Norte o hacia Cd. Juárez sigue la desviación antes mencionada y continua en Gateway Boulevard Este a US 62/180 (Paisano Drive). El tráfico con destino a Cd. Juárez se dobla a la derecha en Paisano; el tráfico con destino al US 54 Norte se retorna en Gateway Boulevard Oeste en Paisano, toma I-10 Oeste y toma la Salida 22B (US 54/Alamogordo/Fort Bliss/Juárez).
Crews will begin work on a drilled shaft in the median of I-10.
|
|
Los siguientes cierres de largo plazo permanecerán en efecto durante la semana del 2 de junio:
- La rampa para Gateway Boulevard Norte a I-110 cerca del Zoológico de El Paso estará cerrada para todo tráfico entre semana.
- Cierres intermitentes de carriles en Gateway Boulevard Este entre Piedras y US 62/180 (Paisano Drive).
- Cierres intermitentes de carriles en Gateway Boulevard Oeste entre Calles Boone y Palm.
- La Rampa T que conecta Gateway Norte Boulevard a US-54 Norte permanecerá cerrada hasta nuevo aviso.
- Los dos retornos entre Gateway Boulevard Norte y Gateway Boulevard Sur sobre US-62 (Paisano Drive) permanecerán cerrados hasta nuevo aviso.
- El retorno de Gateway Boulevard Este a Gateway Boulevard Oeste sobre Trowbridge Drive permanecerá cerrado hasta nuevo aviso.
- Cierres de carriles en US-62 (Paisano Drive) Este y US-62 Oeste sobre US 54 hasta nuevo aviso.
- Cierres de carriles en efecto en Rampa D que conecta US 54 Sur a I-10 Este hasta nuevo aviso.
- Cierres intermitentes de carriles en Gateway Boulevard Sur entre Findley Avenue y US 62 (Paisano Drive).
Todos los cierres están sujetos a cambios debido al clima o condiciones de construcción. Las rampas de acceso y de salida podrán ser cerradas hasta una hora antes de lo publicado.
|
|
|
Se les invita al público asistir a la reunión comunitaria de TxDOT para informarles de los avances del Proyecto I-10 Connect y de los próximos impactos al tráfico. La reunión comunitaria se lleva a cabo a las 5:30pm el martes, 4 de junio, 2019, en el edificio de Educación Médica en Texas Tech University Health Science Center, Paul L. Foster Escuela de Medicina, a la esquina de la Calle Rick Francis y Robert Brown Avenue. En caso de que necesite asistencia especial contacte a TxDOT al (915) 790-4340 antes de las 5pm el lunes, 3 de junio, 2019.
|
|
Sobre I-10 Connect
El Proyecto "I-10 Connect" se encuentra en la intersección de la autopista interestatal I-10 y la carretera US 54 en el Condado de El Paso. El proyecto se extiende desde la carretera I-10 al Circuito 375 (Cesar Chávez Border Highway) y da acceso al Puente Internacional de las Americas (BOTA por sus siglas en Inglés) via la carretera I-110. El proyecto de $96 millones incluye la construcción de cuatro nuevas conexiones directas, la reconstrucción completa de la intersección I-110/US 62 (Paisano Drive), y eliminará las rampas de salida del US 62 al I-110.
La intención de este proyecto es facilitar a los automovilistas el usar el Circuito 375 como un ruta alterna a la I-10, la cual será sujeto a una reconstrucción en el área del centro de El Paso y en la parte Este de la ciudad en los próximos años. I-10 Connect inició su obra el 19 de febrero del 2019 y se estima que concluya en menos de tres años.
Para más información, visite I10ConnectElPaso.com ó siga @I10ConnectEP en Facebook y Twitter.
|
|
|
|