Copy
May 14, 2021
Southbound I-110 closures begin Monday at 9pm
Monday, 05/17/21, through Thursday, 05/20/21, 9PM-6AM
Full Closure of I-110 southbound at I-10
No Detour, No access to Juarez
Crews will be setting girders on Paisano
 
Sunday, 05/23/21, through Thursday, 05/27/21, 9PM-6AM
Sunday, 05/30/21, through Thursday, 06/03/21, 9PM-6AM
Full Closure of I-110 SB at I-10
No Detour, No access to Juarez
Crews will be setting girders on Paisano
 Click to enlarge
Sunday, 05/16/21, 9PM-5AM
  • Full closure of I-10 eastbound at Sunland Park Drive
  • Eastbound entrance ramp at CD lane and Sunland closed
  • Eastbound entrance ramp at flyover and Sunland closed
  • Eastbound entrance ramp on Gateway East and Sunland closed
  • Eastbound entrance ramp at Executive Center Boulevard closed
  • Eastbound entrance ramp at Schuster closed
  • Eastbound entrance ramp at Porfirio Diaz closed
  • Eastbound entrance ramp at Kansas closed
  • Eastbound entrance ramp at Campbell closed
  • Eastbound entrance ramp at Cotton closed
  • DETOUR: Traffic will be diverted to Loop 375 Border West Expressway to US 54 to reenter I-10 East
Crews will be placing overhead bridge for Lane Management System.
Sunday, 05/16/21, 9PM-5AM
  • 3 Right lane closure of I-10EB from Raynolds to the Trowbridge Exit
  • Direct the entrance ramp traffic from Reynolds into the Left lane on I-10EB.
Crews will be working on overhead sign bridge
Click to enlarge
Monday, 05/17/21, and Tuesday, 05/18/21, 9PM-5AM
  • Full closure of I-10 westbound at Piedras exit
  • Full closure of I-10 westbound entrance ramp from Copia
  • DETOUR: traffic will use Gateway West and reenter I-10 via on ramp at Palm Street.
Crews will be removing barrier
Tuesday, 05/18/21, 9AM-4PM
  • Left lane closure on Gateway West from Paisano to 300’ West of Chelsea
  • Right lane closure on Chelsea 200’ North of Intersection to Gateway East
Crews will be working on CCTV
 Click to enlarge
Wednesday, 05/19/21, 9PM-5AM
  • Full closure of US 54 northbound at Loop 375
  • Full closure of Ramp N/Bridge 8
  • DETOUR Traffic to Fonseca and U-turn to 375 WB to Ramp R
  • Full closure of Ramp O
  • DETOUR  traffic to Ramp R
  • Full closure of Ramp T
  • DETOUR all traffic to I-110 northbound entrance ramp to I-10 eastbound, exit and U-turn at Trowbridge to
  • Ramp A
  • No traffic allowed to “cut through” at Ramp J/54N
Crews will be working on barrier at Bridge 10
Monday, 05/17/21, through Saturday, 05/22/21, 9AM-4PM or 9PM-5AM
  • Alternating closures Gateway East from Piedras to Paisano (as needed)
  • Alternating closures Gateway West from US 54 to Palm (as needed)
  • Shoulder work US54 from I-10 to Cassidy (as needed)
  • Crews will be doing electrical and fiber work
6AM-6PM or 6PM-6AM
  • Full closure of Durazno (as needed)
  • Full closure of Rosa (as needed)
  • Full closure of Uva (as needed)
  • Detour traffic using Durazno, Bowie, Rosa
Crews will be doing Structure Work

Please follow the detour signs in place on all projects. All work is dependent upon weather conditions

Communications Update

Please note, as the I-10 Connect Project moves toward completion, the project hotline and text message alerts have been discontinued. For questions about the project, please dial (915) 790-4340 or send an email to Jennifer.Wright3@txdot.gov.

About the I-10 Connect Project

The I-10 Connect project is at the intersection of Interstate 10 and US 54 in El Paso County. The project extends from I-10 to Loop 375 (Cesar Chávez Border Highway) and provides access to the Bridge of the Americas (BOTA) via I-110. The $96 million project includes the construction of four new direct connectors, a full reconstruction of the I-110/US 62 (Paisano Drive) interchange, and removes exit ramps from US 62 to I-110.

I-10 Connect will improve connectivity between I-10 and Loop 375, also providing an alternate route to I-10. It started February 19, 2019, and is expected to be complete in less than three years.

Copyright © *2021 *I-10 Connect El Paso*, All rights reserved.

Want to change how you receive these emails?
You can update your preferences or unsubscribe from this list.






This email was sent to <<Email Address>>
why did I get this?    unsubscribe from this list    update subscription preferences
I-10 Connect · 13301 Gateway Blvd W · El Paso, TX 79928-5410 · USA

Email Marketing Powered by Mailchimp